Skip to content ↓

New ramp being built at 77 Mass. Ave.

Construction work will begin next week on a new handicapped-accessible entrance ramp on the north side of the steps at 77 Massachusetts Ave.

The project, designed by the Boston architectural firm Tellalian Associates, is part of MIT's efforts to comply with the Americans with Disabilities Act. It should be finished by late December.

Starting on Tuesday, Oct. 8, a number of old overgrown shrubs and trees will be removed from the future site of the ramp and new steps behind the MBTA bus shelter. Shrubs will also be removed from the south side of the steps to balance the look of the main entrance. Both sides will have new plants after construction is done.

The work will cause some daytime noise and will occupy a few parking spaces, so the food trucks will move a short distance.

A version of this article appeared in MIT Tech Talk on October 2, 2002.

Related Topics

More MIT News

Globular blue and white orbs "examining" single-stranded RNA products and marking them with green checks or red x's

Why are some bacterial genes high in purines?

In certain species of bacteria, the answer lies in shielding RNA transcripts from a quality-control factor called Rho. Understanding the requirements for expressible sequences is critical for expression engineering of therapeutic agents.

Read full story

Rich Nielsen, Volha Charnysh, Kevin Dorst, and Emily Richmond Pollock seated at a table, talking

Building a scholarly community

The SHASS Faculty Fellows Program, administered by the MIT Human Insight Collaborative, is fostering new research projects and creating space for supportive and interdisciplinary discussion.

Read full story