Skip to content ↓

Power restored to campus buildings

CAMBRIDGE, Mass. -- Fifteen MIT buildings on the north and west sections of campus suffered a power failure Thursday when an NStar-operated transformer that services North Cambridge failed at 11:30 a.m.

Workers in Buildings W11, W59, W89, W92, NW10 NW14, NW17, NW20, NW22, NW61, NW62, N42, N51, N52 and N57 were sent home for the remainder of the day. Power was restored by 2:00 p.m.

Electrical service was restored to Building NE43 (545 Technology Square) and normal operations resumed Thursday morning at the Laboratory for Computer Science, the Artificial Intelligence Laboratory and other MIT offices located in the building.

NE43 was closed Monday night after an electrical feeder malfunctioned and electrical power was shut down. The power was restored late Wednesday afternoon.

Related Topics

More MIT News

Globular blue and white orbs "examining" single-stranded RNA products and marking them with green checks or red x's

Why are some bacterial genes high in purines?

In certain species of bacteria, the answer lies in shielding RNA transcripts from a quality-control factor called Rho. Understanding the requirements for expressible sequences is critical for expression engineering of therapeutic agents.

Read full story

Rich Nielsen, Volha Charnysh, Kevin Dorst, and Emily Richmond Pollock seated at a table, talking

Building a scholarly community

The SHASS Faculty Fellows Program, administered by the MIT Human Insight Collaborative, is fostering new research projects and creating space for supportive and interdisciplinary discussion.

Read full story