How it’s made
A seminar series on the nuts and bolts of constructing a 200,000 square-foot nanotechnology laboratory comes to MIT.
MIT’s sustainability community gets to work
Inaugural event brings together over 100 campus leaders to plan for greater efficiency, reduced waste.
Being a housemaster means never having to shovel again
Mentorship, camaraderie, and — yes — free snow removal are among many housemaster benefits.
A new look — and lights — for historic MIT Sloan building
MIT Sloan’s original building, E52, will re-open in January 2016 and feature a light installation by artist Leo Villareal.
Renewing a place of faith
Iconic MIT Chapel closes until 2015 for a substantial renewal; programs move to other locations.
How construction of MIT’s newest building will affect the campus
Project managers hold community meetings to explain impact of MIT.nano.
New building will be a hub for nanoscale research
“MIT.nano,” to be built in the heart of campus, will house advanced cleanroom, imaging, and prototyping facilities.
3 Questions: Arindam Dutta on MIT and architectural modernism
New book, edited by MIT architectural historian, examines the evolution of modernism during its postwar heyday at the Institute.
Where the ‘beaver works’
A collaborative space at MIT Lincoln Laboratory, called the Beaver Works Center, will create new opportunities in project-based learning.
MIT’s Lobby 10 to be renamed in honor of fallen veterans
Already home to war memorials, central campus location to get official new name: ‘Memorial Lobby.’
East Campus/Kendall gateway study begins
Urban design team selected; MIT and Cambridge community meetings set.