Skip to content ↓

Construction update

The summer brings with it a wave of campus construction projects, including the start of work for the Physics, Department of Materials Science and Engineering, Spectroscopy Lab Infrastructure (PDSI). In addition, the first floor men's restroom at the intersection of Buildings 6 and 8 will be renovated into a women's restroom. For details on these and other projects, visit web.mit.edu/facilities/construction/updates.shtml.

A version of this article appeared in MIT Tech Talk on June 8, 2005 (download PDF).

Related Links

Related Topics

More MIT News

Globular blue and white orbs "examining" single-stranded RNA products and marking them with green checks or red x's

Why are some bacterial genes high in purines?

In certain species of bacteria, the answer lies in shielding RNA transcripts from a quality-control factor called Rho. Understanding the requirements for expressible sequences is critical for expression engineering of therapeutic agents.

Read full story

Rich Nielsen, Volha Charnysh, Kevin Dorst, and Emily Richmond Pollock seated at a table, talking

Building a scholarly community

The SHASS Faculty Fellows Program, administered by the MIT Human Insight Collaborative, is fostering new research projects and creating space for supportive and interdisciplinary discussion.

Read full story