Skip to content ↓

Construction Update

Stata Center

Landscaping and paver installation is proceeding throughout the site, including the raised garden area. Pedestrian and vehicular access to the East Annex lot is now restricted. Pedestrians should use the entrance at Building 66; deliveries must come down Ames Street and enter through the south side of Building 56. Cyclists may park bikes outside Building 56.


Building 48

Demolition work is complete. New second-floor construction will begin this week.

A version of this article appeared in MIT Tech Talk on November 5, 2003.

Related Topics

More MIT News

Globular blue and white orbs "examining" single-stranded RNA products and marking them with green checks or red x's

Why are some bacterial genes high in purines?

In certain species of bacteria, the answer lies in shielding RNA transcripts from a quality-control factor called Rho. Understanding the requirements for expressible sequences is critical for expression engineering of therapeutic agents.

Read full story

Rich Nielsen, Volha Charnysh, Kevin Dorst, and Emily Richmond Pollock seated at a table, talking

Building a scholarly community

The SHASS Faculty Fellows Program, administered by the MIT Human Insight Collaborative, is fostering new research projects and creating space for supportive and interdisciplinary discussion.

Read full story