Skip to content ↓

Construction update

LOBBY 7

A major restoration to Lobby 7 begins with installation of scaffolding next week.

MEDIA LAB ADDITION

Investigatory utility work on Ames Street that requires opening certain manholes between Main and Amherst Streets could affect pedestrian and vehicular traffic.

STATA CENTER

The East Annex parking lot will be closed on Saturdays for the next few weeks to allow concrete truck delivery. East Garage will remain open. The walkway between Buildings 36 and 66 will also be closed to ensure pedestrian safety.

SIMMONS HALL

The installation of an electrical duct bank could result in utility shutdowns and may affect pedestrian and vehicular traffic and cause vibrations.

CHEMISTRY BUILDING

Construction of the labs on the north end of the building has begun. Saws used to cut the concrete floors will cause noise between 6am and 2pm.

70 PACIFIC ST.

Utility installation and concrete foundation pouring may generate dust and noise and disrupt traffic.

������
This information is provided by the Department of Facilities.

A version of this article appeared in MIT Tech Talk on March 21, 2001.

Related Links

Related Topics

More MIT News

Globular blue and white orbs "examining" single-stranded RNA products and marking them with green checks or red x's

Why are some bacterial genes high in purines?

In certain species of bacteria, the answer lies in shielding RNA transcripts from a quality-control factor called Rho. Understanding the requirements for expressible sequences is critical for expression engineering of therapeutic agents.

Read full story

Rich Nielsen, Volha Charnysh, Kevin Dorst, and Emily Richmond Pollock seated at a table, talking

Building a scholarly community

The SHASS Faculty Fellows Program, administered by the MIT Human Insight Collaborative, is fostering new research projects and creating space for supportive and interdisciplinary discussion.

Read full story